Tea Tree Road – Yunta

Concrete Works Drainage

Completed

2024

Scope

Excavation, Concrete works, Cattle grid removal, Cattle grid installation, Culvert installation

Client

Dunns Earthmoving / SA Roads / Department for Infrastructure and Transport

The Tea Tree Road project featured extensive earthworks, including cut-to-fill operations and detailed excavation, to prepare the site for the installation of floodway infrastructure. Toe walls and concrete aprons were constructed on three floodways to enhance durability and reduce erosion risks. The team removed an outdated cattle grid, replacing it with a modern structure to improve livestock management.

A key challenge was the installation of a 1200 x 900 mm triple-cell box culvert run. The culvert was constructed in two halves to maintain uninterrupted traffic flow for both mining and construction vehicles. Strategic traffic diversions ensured that safety and operational efficiency were prioritised throughout the project timeline.