Base Civil installed 300m of 375mm drainage pipe and associated pits, alongside 500m of potable watermain. The team also installed 30 below-ground tap boxes, ensuring reliable water access. The project was completed to align with the client’s infrastructure needs, maintaining quality and efficiency throughout.