Base Civil completed 200m of sewer installation with groundwater present, utilising dewatering equipment such as 4-inch pumps, shoring boxes, and sand traps to manage silt and sediment. Stormwater works included 200m of pipe installation with associated pits and front-of-block connections. Additionally, 250m of potable water mains, including below-ground boxes, stop valves, and fire plugs, were installed, providing a complete infrastructure solution.