Base Civil undertook road reconstruction works in the remote communities of Pipalyatjara and Kalka to repair damage caused by flooding.
The works included importing and moisture-conditioning 2,000 tonnes of material from a borrow pit using a road stabiliser to achieve optimal moisture content. Cement stabilisation was then applied to in situ materials across multiple floodways to enhance durability. The project scope involved stabilising a 300 m-long by 10 m-wide water crossing and re-sheeting three separate 800 m road sections. The use of stabilised materials ensured a long-lasting solution in challenging remote conditions.